Laserfiche WebLink
Project; <br />~ ~ G EOTEC H <br />~ Client / On Site Rep: <br />Bowie Resources - B. Bear <br />Bowie Mine Gob Pile Stability Contractor /Rep: <br /> TECHNICAL ENGINEERS <br />T <br />& Load Out Services -Steve West <br />Project No: <br />2005126-CMT Date: <br />10/12/2007 URAL <br />CIVIL STRUC <br />GEO <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY COMPACTIO N REPORT <br /> LOCATION GRADE ELEV ~~ TYPE MAX DRY OPTIMUM DRY MOISTURE PERCEPIT Nor SOIL LAB <br />TEST <br />NUMBER <br />Gob Pile No. 4 Embankment NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (°io) DENSITY <br />(pcf) CONTENT <br />(°i°) COMPACTION WI'T'HIN <br />SPEC Tree SAMPLE <br />NUMBER <br />164 PT#4242 N19309.5750/E36126.7300 6156.2 X 91.9 8.4 82.7 12.8 90.0 ab 4230/31r/c @28% <br />165 PT#4243 N19400.9070/E36724.0230 6150.2 X 90.2 10.0 86.6 10.7 96.0 gob 4230/31r/c @16% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATIONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment. Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: ~ Day: S M T W Th F <br />X S <br />Sheepsfoot: 0 <br /> Part Time: ~ Weather: Sun Clear Overcast Rain Snow <br />Specified X Smooth Drum Roller: <br />Moisture n/a Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site VIsITs/Day: ~ Temp: To 32 32-50 <br />X 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: ~ Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): ~X <br />Laboratory Testing ASTM 698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Bowie Resources <br /> <br />B. Bear Humidity: Dry <br /> <br />X Mod Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: InsufFcient amount of <br />material placed. Informed (Rep of Company) of Test Results: <br />BOWIe R2SOUrce5 - B. Bear <br />Buckhorn was not informed prior <br />h <br />l <br />i <br />h <br />Contractor Not Working Due To: The Contractor Is: LOadOUt ServiCeS - Ty Hyatt to our arriva <br />on s <br />te t <br />at t <br />e <br />Contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment MalfUnctlO~: <br />Processing Frozen Material: Processing Wet Material; <br /> <br />Stripping and/or Grubbing: Moisture Conditioning °ry Mat'I: Field Copies Given To: <br /> <br />Contractor: <br />Client: on th(s date. <br /> <br />Unkn°Wn: <br />Stodcpiiing Fill: Removing Unwitable Magi: CMJGM: <br />Other: PAGE i OF 1 <br />05-?26-CMT Bowie Mine Gob Pile Stability.xlsDCR90-72-Q7Is#164-sjlcc <br />