Laserfiche WebLink
Project: <br />' ~ ' G EOTEC H <br />' Client / On Site Rep: <br />Bowie Resources - B. Bear <br /> R <br />Bowie Mine Gob Pile Stability Contractor / <br />ep: <br /> Load Out Services -Steve West <br />Project No: <br />2005126-CMT Date: <br />10/5/2007 CML STRUCTURAL & GEOTECHNICAL ENGINEERS <br />CONSTRUCTION MATERYALS TESTING LABORATORY Technician: <br />B. Wilson <br />DAILY COMPACTIO N REPORT <br />T LOCATION GRADE ELEV TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NoT SOIL LAB <br />EST <br />NUMBER <br />Gob Pile No. 4 Embankment NUC SAND DENSITY <br />(pCt) MOISTURE <br />CONT. (%) DENSITY <br />(pct] CONTENT <br />(%} COMPACTION WITHIN <br />SPEC TYPE SAMPLE <br />NUMBER <br />161 (PT#4239 N19391.5700/E36697.9810 6146.3 X 90.6 9.5 84.5 11.7 93.3 ob 4230/31r/c @20% <br />162 (PT#4240 N19349.5100/E36543.7430 6146.8 X 90.6 9.5 88.9 12.5 98.1 ob 4230/31r/c@20% <br />163 RT#4241) N19312.4100/E36339.2750 6148.3 X 90.6 9.5 94.4 11.7 104.2 ob 4z3a/31r/c @2a°i° <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATIONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cahesionless Soils Full Time: ~ Day: S M T W Th F <br />X S <br />Sheepsfoot: ~X <br /> Part Time: ~ Weather: Sun Gear Overcast Rain Snow <br />Spec'tfled X X Smooth Drum Roller; <br />Moisture Cohesive Soils X <br />Requirement: n/a Cohesionless Soils Number of Site Visits/Day: ~1 Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: ~ Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): 0 <br />Laboratory Testing ASTM 698 Cohesive Soils X <br />Procedure: <br />Cahesionless Soils Bowie Resources <br /> <br />B. Bear Humidity: Dry <br /> <br />X Mad Humid Haul TrafFc <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount of <br />material placed. Informed (Rep of Company) of Test Results: <br />BOWIe Resources - B. Bear <br />Buckhorn was not informed prior <br />l <br />t <br />i <br />it <br />th <br />t th <br />Contractor Not Working Due To: The Contractor Is: LOadOUt Services - T. Hyatt o our arr <br />va <br />on s <br />e <br />a <br />e <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment MaIfUnCtlOn: <br />Pr°cessing Frozen Materiah Processing Wet Material: <br /> <br />Stripping and/or Grubbing: ~M°isture Conditioning Dry Mat'1: Field Copies Given To: <br /> <br />Contractor. <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling FBI: Removing Unsuitable Magi: CM/GM: <br />Other: PAGE 1 OF 1 <br />D5-926-CMT Bowie Mine Gab Pile Stability.xlsDCR10-05-07rw#161-sj/cc <br />