Laserfiche WebLink
Project: <br />' ~ ' G El)TEC H Client / On Site Rep: <br />Bowie Resources - B. Bear <br />Bowie Mine Gob Pile Stability Contractor /Rep: <br /> I Load Out Services -Steve West <br />Project No: <br />2005126-CMT Date: <br />11/16/2007 C <br />VIL STRUCTURAL & GEOTECHNICAL ENGINEERS <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br />DAILY CO MPACTIO N REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT rroT SOIL LAB <br />TEST <br />NUMBER Compacted Embankment <br />GOb Pile NO. 4 GRADE ELEV <br />NUC <br />SAND DENSITY <br />(per MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION wrrHlN <br />SPEC TYPE SAMPLE <br />NUMBER <br />1698 Retest 6166.1 X 91.1 9.2 90.3 12:3 99.1 ob 4230/31r/c @22% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATIONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: ~ Day: S M T W Th F <br />X 5 <br />Sheepsfoot: 0 <br /> Part Time: ~ Weather: Sun Clear Overcast Rain Snow <br />Specified X X Smooth Drum Roller: <br />Moisture n/a Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: ~ Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: ~ Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing gSTM 698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Bowie Resources <br /> <br />B. Bear Humidity: Dry <br /> <br />X Mod Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR 11iE FOLLOWING REASONS: Insufficient amount of <br />material placed. Informed (Rep of Company) of Test Results: <br />LOad Out Services - Ty Hyatt <br />Buckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would not be workin <br /> <br /> <br />IrlClement Weather: <br /> <br />Equipment MalfUnCtl°n: <br /> <br />Processing Frozen Material: ~Processing Wet Material: <br /> <br />stripp(ng and/or Grubbing: ~MOisture Conditioning Dry Mat'I: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: g <br />on this date. <br /> <br />Unknown: <br />Stockpiling Flit: Removing Unsuitable Mat9: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-926-CMT Bawie Mine Gab Pile Stability.xlsDCR11-16-07/s#1698-sj <br />