My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-15_PERMIT FILE - M2007044 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-01-15_PERMIT FILE - M2007044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:01 PM
Creation date
1/17/2008 10:02:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
1/15/2008
Doc Name
Response to PAR
From
Energy Fuels Resources Corporation
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
alternatives for Division review and approval. A minimum of three Atterberg Limit <br />tests must be conducted on representative soil samples during construction of the ore <br />pad. <br />The Operator may not use the pad for ore storage until the compaction is complete <br />and the Division has reviewed and accepted the soil test results. Also, the Operator <br />must periodically inspect the pad for indications of desiccation and freeze/thaw <br />effects that will increase permeability. If these effects are observed, the upper twelve <br />inches of soil must be reworked, moisture conditioned as needed, and compacted. <br />The Operator must report on ore pad inspections and any reworking of the pad soil <br />liner in each annual reclamation report. <br />The proposed ore pad is similar in design to the ore pads that have been traditionally <br />permitted and used on the Colorado Plateau. The proposed liner consisted of run-of- <br />mine waste and was not intended to be totally impermeable (i.e., hydraulic <br />conductivity of about 1 x 10"5 cm/s); rather, we had proposed to over-excavate the <br />pad liner during closure to recover any radionuclides and metals that had seeped into <br />the pad over time. Since there is almost no hydraulic head on the ore pad liner, the <br />amount of material that had to be excavated at closure was minimal (i.e., estimated to <br />be about 18 inches). This approach had been tentatively approved by DBMS staff <br />during earlier meetings on the project. <br />Energy Fuels does not object to upgrading the liner for the ore pad, provided that we <br />are permitted to store ore for longer than the 6 month period allowed by DBMS for <br />more traditional ore pads. The Whirlwind Mine area is not located near a good source <br />of clay that could be used to build a less permeable ore pad. Therefore, we are <br />including an alternate design using a geosynthetic liner for your consideration. The <br />design was prepared by Golder Associates and is included as Attachment F to this <br />response letter. The specifications included with this design include 3rd-party quality <br />assurance (QA) inspections and testing. QA reports will be submitted to DBMS for <br />review prior to pad loading. <br />12) Placement of the soil liner should have a temperature limitation. No frozen soil liner <br />materials shall be used as liner fill. Preparation of the native area should be a major <br />consideration prior to placement of the soil liner fill. It must be reasonably smooth and <br />void of large rocks and objects. <br />The Golder pad design, included as Attachment F, provides engineering specifications <br />for pad construction including placement of fill material and sub-base preparation. <br />13) Surface Water Management: The Applicant proposes a number of permanent surface <br />water diversion structures in the mining and reclamation plans. These structures <br />have been sized to safely pass flows from a 100 year, 24-hour precipitation event. <br />Since the diversions are to remain following reclamation, the Division requires that <br />they be sized to pass flows resulting from the probable maximum precipitation event. <br />1:~~~rgy 1"uel5 R~5<~~u~c~s C;c>r~c>raticm =1~ lnic:m I~cnrle~acd, ~t~ite (i0t} 10 <br />1..~1a~~~t~c~cl, C~~) $f}12~ 1'hc~i~~: 303-t)74-2~14t) <br />
The URL can be used to link to this page
Your browser does not support the video tag.