Laserfiche WebLink
§2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />Backfilling and Grading <br />1. The two mine adits have been backfilled in accordance with Volume <br />6A -Final Abandonment Tab, Figure 2.05-6. <br />2. As the result of a mine fire in 1986, the ventilation shaft was sealed. <br />3. Although the mine permit describes "rock tunnels", they were never <br />constructed and therefore references to these structures and their <br />subsequent reclamation elsewhere in the permit should be ignored. <br />Timber Storage Area <br />The ROM storage pile has been reduced from approximately 38,000 <br />cu. yds. of stored ROM coal to approximately 17,000 cu. yds. of ROM <br />coal storage. <br />Unit Train Loadout and Highway Stockpile <br />The Highway Stockpile was temporarily stabilized during 2002. The <br />Unit Train loadout is still active and therefore has no new reclamation <br />activities to report. <br />TR-43 <br />60-c <br />01 /04 <br />/~ PPRov61> <br />Z/2o/o y <br />