Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action : TR34 <br />Task description :Replace 9 inches topsoil on non-coal Waste Disposal site <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $84.86 NA <br /> Operating cosUhour : $138.49 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $256.13 Total fleet cosUhour : $256.13 <br />MATERIAL:::::UANTITI E :::.::.::............ <br />Q S .................................................... ......................................................................... .............................. ........................... <br />Initial Swell Loose <br />volume : 5,445 L CY factor : NA volume : 5,445 LCY <br /> <br />Source of estimated volume :4.5 acres x 0. 75'th. <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION .: <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 2,105.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rfl <br /> Push gradient : 0.99 (Cat HB) <br />Average push gradient : 1.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,350 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth -Dry packed <br />Adjusted unit production : 1028.70 LCY/hr <br />Adjusted fleet production : 1,028.70 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.29 Hours <br />Unit cost : $0.249 /LCY Total job cost : $1,356 <br />:4.. <br />