Laserfiche WebLink
Pole Barn <br />Historically, a pole barn was located in the No. SA supply yard and was used for equipment and materials storage. <br />The structure has been removed from the site. <br />Petroleum Product <br />The following petroleum product tanks are located at the EC mine site. <br />No. 5 Portal Area <br />SUBSTANCE MAXIMUM QUANTITY CONTAINMENT AREA <br />Antifreeze 500 gallons storage tank Fuel island <br />Diesel fuel 8,000 gallons storage tank Fuel island <br />Oil 2,000 gallons storage tank Fuel island <br />Gasoline 1,000 gallons storage tank Fuel island <br />Oil 1,375 gallons 5 storage tanks Shop pump room <br />Antifreeze 275 gallons storage tank Shop pump room <br />Used oil 750 gallons storage tank NW of shop <br />Used oil 500 gallons storage tank SE of shop <br />Misc. oil 1,200 gallons 240 portable containers Warehouse yard <br />No. SA Portal Area <br />SUBSTANCE MAXIMUM QUANTITY CONTAINMENT AREA <br />Misc. oil 600 gallons 85 portable containers Rock Crusher <br />Diesel fuel S00 gallons portable containers For contractors <br />Antifreeze 360 gallons storage tank SA yard <br />Misc. oil 550 gallons 10 portable containers SA yard <br />Diesel fuel 4,000 gallons storage tank SA yard <br />Oil 2,000 gallons storage tank 5A yard <br />No. SA Portal Area <br />SUBSTANCE MAXIMUM QUANTITY CONTAINMENT AREA <br />Used ail 3,000 gallons storage tank Multiple Serv. building <br />Emulsion oil 10,000 gallons storage tank ~ Multiple Serv. building <br />Emulsion & Water 8,000 gallons (2) 4000 gal storage tanks Multiple Serv. building <br />Emulsion & Water 1,000 gallons mixing tank Multiple Serv. building <br />Chemical Storage 10,000 gallons storage tank Multiple Serv. building <br />(MgCL or NaCL) <br />Oil 1,000 gallons (2) 500 gallon storage tanks Multiple Serv. building <br />Antifreeze 500 gallons storage tank Multiple Serv. building <br />Oil 500 gallons (100) portable containers Multiple Serv. building <br />Used oil 2,000 gallons portable storage tank No. 5 or SA portal areas <br />Waste Disnosal Sites <br />The presently approved waste disposal site was approved and initial construction commenced in 1983. It was <br />planned for all development waste and course reject from the mine operation to be hauled and disposed at this site. <br />The engineering group of CTL-Thompson, Inc. conducted the geotechnical evaluation of the disposal site. This <br />geotechnical evaluation is presented in Exhibit 21, Waste Disposal site. Additional information concerning the <br />Permit Revision 04-34 2.05-14 Revised 7/2/04 <br />