In order to prevent water from seeping out of the ponds, they have been lined with bentonite. The bentonite was <br />applied to the pond bottom and embankments and mixed in the surface soil layer. The heterogeneous mass of <br />bentonite and soil was wetted and then rolled to form a good seal. The embankments are sloped at 3H:1 V and should <br />not present any operational problems. <br />Each of the ponds has a dewatering device located in its bottom. Once a pond is filled with settled solids, it will be <br />taken out of service and solids removed. The water that is drained from the pond will flow into a sump and then <br />pumped from the sump into the firs[ functioning pond of the system. This will prevent any discharge of water, high in <br />suspended solids, into [he Williams Fork River. <br />Two ramps as shown on Map 27, will be installed up the embankments of the ponds to provide access for sediment <br />cleaning equipment A contractor will be utilized in the maintenance operation. The solids will be hauled [o the waste <br />disposal site or placed into an approved landfill. However, the material may be subjected to soil and overburden <br />testing, and depending on the test results, the material may be used as a plant growth media. I[ is understood by EC <br />that the DMG and OSM must approve [his alternate use of material before the material is used as a plant growth <br />media. <br />A discharge ditch has been constructed to allow water discharged from the ponds to enter the Williams Fork River. <br />All discharge is in compliance with the terms of the NPDES Permit. <br />In order to supply additional water to the mine for dust suppression, longwall emulsion, and other mining related uses, <br />EC proposed to use water from the #5 Mine Discharge Well. To accomplish this, approximately 400' of 4" pipe was <br />installed between pond SP-6 and the waterline that comes up from the Wise Hill #4 Well. The waterline was buried 5' <br />to 6' deep, and extended south approximately 275' (from the west end of pond SP-6) and, from there, west <br />approximately 125'. A transformer will sit on the west bank of pond 5-P6 or on a pole adjacent to the pond. The <br />pump will be put in a small pump house adjacent to the transformer to supply water. There is a small area exemption <br />for the pump house disturbance (see Exhibit 18, page 373). After the line was buried, the disturbed area (2' x 350' _ <br />700 ft2) was seeded with pastureland seed mix. The remaining 100' is part of the haul road and railroad so no seeding <br />was required. <br />7 North Angle Dewatering Borehole <br />An additional dewatering borehole was drilled into the 7 North Angle of the No. 5 Mine. The borehole was reamed <br />out [o a nominal 15 inch diameter and 12 3/4 inch steel casing was placed in the hole. The annular space was grouted. <br />A pump was installed to pump water from the 7 North Angle sump. The capacity of the pump is approximately 400 <br />gpm. The dewatering borehole was located on a pad approximately 100' x 100'. Approximately 18 inches of topsoil <br />(550 cy) was salvaged from the pad. The well head was enclosed in a building along with the control panel and <br />chemical metering system. The building sits on a cement pad approximately 12' x 10' x 1' in size. An in-line static <br />mixer was placed in the discharge pipe to facilitate mixing of the coagulant and the mine discharge. The water was <br />then discharged into ditch 9-D 14. <br />A chemical metering pump will be used to inject the coagulant (Nalco 8852 or equivalent) into the discharge stream. <br />The system will be used only as needed, and it is anticipated that the system will have little if any usage. Past <br />experience with the No. 5 Mine sump indicates adequate settling access underground and coagulants are not needed <br />to meet discharge permit requirements. <br />As shown on Map 26, a sump will be excavated upstream of culvert 50. This will allow for settling of suspended <br />material prior [o entering culvert. It is anticipated this will decrease maintenance work on this culvert. The pump will <br />be approximately 5' wide x 25' long x 2' deep. Therefore, approximately 10 cy of topsoil will be stockpiled adjacent to <br />the sump. The stockpiled topsoil will be stabilized with the appropriate seed mixture. <br />Permit Revision 04-34 2.05-12 Revised 7/2/04 <br />