My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-16_PERMIT FILE - C1981044A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981044A
>
2007-11-16_PERMIT FILE - C1981044A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:28 PM
Creation date
1/16/2008 1:39:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044A
IBM Index Class Name
Permit File
Doc Date
11/16/2007
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 APPLICATION FOR PERMTI' FOR SURFACE OR UNDERGROUND MINING ACTNITIES-MINIMUM <br />REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS <br />2.05.1 OBJECTNES <br />The objectives of this section are to ensure that the Colorado Mined Land Reclamation Division is provided with <br />comprehensive and reliable information on the existing and planned coal mining operations, and to ensure that those <br />operations will be allowed to be conducted in compliance with the coal regulations of the Colorado Mined Land <br />Reclamation Board and the Colorado Surface Coal Mining Reclamation Act, Article 33 of Title 34 as amended <br />Colorado Revised Statutes of 1973. Information presented in this permit which addresses 2,05 is referenced as <br />necessary to the applicable environmental baseline information of 2.04 to demonstrate that the operation is being <br />conducted consistent with environmental resources information. <br />2.05.2 OPERATION PLAN -ESTIMATED AREA FOR LIFE OF OPERATION <br />EC has submitted an Operation and Reclamation Plan for the entire area for the life of the proposed operation. In <br />addition, environmental baseline information has been collected for the entire life-of--mine area. The proposed permit <br />boundary shown on all maps and described in the legal description also covers the entire area for the life of the <br />operation. <br />EC will employ detailed and current engineering designs for all underground mining activities in order [o maximize <br />coal recovery. A detailed description of all planned mining operations is contained within Section 2.05.3 Operation <br />Plan -Permit Area. In all cases, proposed mining operations are designed for maximum coal recovery. <br />The area to be affected over the life of the planned operation is shown on the Life-of-Mine Plan Map (Map 22). <br />Electrical transmission lines, county roads, state roads, an oil pipeline, and a railroad traverse the permit area. <br />Facilities overlying the planned operation include office and mine facilities, houses, sediment ponds, and sediment <br />control ditches. Farming activity exists on the hill slopes and in the valley floors. In addition, portions of the Trapper <br />Strip Mine overlay the operation. Particular impacts on these areas and facilities will be discussed herein. <br />The primary mining method to be employed by EC will be underground longwall. Room and pillar mining will be <br />employed for development of the longwall system, and, if needed, as a supplement to coal production. The primary <br />mining method of longwall will be employed in both the 5ve year mine plan as well as the life-of--mine plan presented <br />in this permit. <br />2.05.3 OPERATION PLAN -PERMIT AREA <br />Production Methods and Eauinment <br />EC engineers through careful evaluation of geologic, production, and economic information have concluded that the <br />only economic and efficient mining method is the employment of a longwall system. As of May 1985, a longwall <br />system has been in production in the No. 5 mine at EC. The longwall system is the primary mining method employed <br />at both the No. 5 and No. 6 mines as shown on the No. 5 Mine Plan Map (Map 22) and the No. 6 Mine Plan Map <br />(Map 23). <br />The No. 5 mine produced coal from the "F" seam, while the No. 6 mine can produce coal from the "E" and "H" seam. <br />Additional geologic information has been provided on these coal seams as well as the associated burden materials in <br />Section 2.04.6 Geology Description. <br />Although the longwall system will be the primary mining method employed at the EC mines, standard room and <br />pillar mining will be utilized for the development areas of the longwall system, and, if needed, to supplement coal <br />production. The North Main rock ramps will be developed with a roadheader. <br />Permit Renewal No. 4 2.05-1 Revised 3/5/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.