Laserfiche WebLink
u <br />• <br /> <br />Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br />.. <br />Haulage System: Trapper Mining Inc. 2005 Haul Cycle: [PRJJ G7-02 to G Dip #2 <br />Material: PRJ To soil Rosier: PRJ 5 da Week - 8 Hour Shifts <br /> ~r .:s 'e t~ .. <br />Availability % 100.00 <br />Average Bucket Volume cu.yards 38.02 <br />Bucket Fill Factor 0.72 <br />Average Payload bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by availabiliry <br />Average Operating Shifts per Year shifts/Year 261.00 Shifts factored by availabiliry <br />'Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour bcy 848.31 <br />Production per Loader Operating Shift bcy 6,362 Max. prod, based on 100% avail. <br />Production per Year bcy 1,660,559. Avg. production facored by avail, <br />Wait Time er O eratin Hour min 19.89 ~ - <br /> ,k. ~. <br />Availability % 92.50 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,810.69 <br />Average Payload bcy 25.00 <br />Production per Operating Hour bcy 229.27 <br />Production per Loader Operating Shift bcy 1,591 <br />Production per Year bcy 415,140 <br />Oueue Time at Loader min/ Cycle 0.19 <br />Spot Time at loader min/ Cycle 0.00 <br />Average Loading Time min/ Cycle 1.00 <br />Average Travel Time min/ Cycle 3.51 <br />Spot Time at Dump min! Cycle 0.20 <br />Average Dump Time min/ Cycle 1.00 <br />Average Cycle Time min/ Cycle 5.90 <br />Flees Size 4 <br />Avera a No. of Bucket Passes 1.00 <br />~, <br /> <br />production per Year <br />bcy/Year ss < <br />1,660,559 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodology <br />Discounted Operating Cost $/bcy 0.00 Double Sided <br />Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br />Productivity estimates allow for insuffi cient time at t he end of the shift to complete another cycle. <br />Time for the first bucket pass coi ncides with th e truck queuing and maneuvering times. <br />This simulation is based o n data provide d by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br /> <br />Prepared by: Tonia Perkins <br />Trapper <br />23-Aug-2005 10:23 AM Page 1 <br />