My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> <br />• <br />Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br />.. <br />Haulage System: Trapper Mining inc. 2005 Haul Cycle: (PRJj F97-1 to F SE Corner <br />Material: PRJ To soil Roster: PRJ 5 da Week - B.Hour Shifts <br /> _ s ::r or. , ,. <br />Availability % 100.00 <br />Average Bucket Volume cu.yards 38.02 <br />Bucket Fill Factor 0.72 <br />Average Payloatl bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by evailabllity <br />Average Operating Shifts per Year shifts/Year 261.00 Shifts tailored by availability <br />Average Bucket Cycle Time min 0.50 <br />Production per Operating Hour trcy 1,243.05 <br />Production per Loader Operating Shift bcy 9,323 Max. prod. based on 1(Hl%avail. <br />Production per Year bcy 2,433,274 Avg. production factored by avail. <br />WaitTime er0 eratin Hour min _4.40 <br /> _ sf <br />Availability % 92.50 <br />Payload in Template bcy 25.00 <br />Operating Hours per Year OpHr/Year 1,810.69 <br />Average Payloatl bcy 25.00 <br />Production per Operating Hour bcy 335.96 <br />Production per Loader Operating Shift bcy 2,331 <br />Production per Year bcy 608,318 <br />Queue Time at Loader miN Cycle 0.25 <br />Spot Time at loader min/ Cycle 0.00 <br />Average Loading Time min/ Cycle 1.00 <br />Average Travel Time min/ Cycle 1.59 <br />Spot Time at Dump min/ Cycle 0.20 <br />Average Dump Time min/ Cycle 1.00 <br />Averag= Cycle Time min/ Cycle 4.04 <br />Fleet Size 4 <br />Avera a No.otBucket Passes 1.00 <br />.:,,:, <br />Production per Year bcy/Year 2,433,274 <br />Discounted Capital Cost $/bcy 0.00 Loading Methodology <br />Discounted Operating Cost $/bcy 0.00 Double Sided <br />Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 750 Shifts <br />Productivity estimates allow for insuffi cient time at the end of the shift to complete another cycle. <br />Time for the first bucket pass coi ncides with the truck queuing and maneuvering times. <br />This simulation is based on data provided by the equipment manufacturer. <br />Equipment data should be checked to ensure it is valid for this site. <br /> <br />Prepared by: Tonia Perkins <br />Trapper <br />23-Aug-2005 10:13 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.