My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining •Inc. 2005 •il Cycle: (PRJJ A92-1 to F Rd #3 #4 /nt (143,049 Cyds.J <br /> Material: PRJ To soil Roster: PRJ S da Week - 8 Hour Shifts <br /> r.:., ~ p. <br /> Availability % 100.00 • <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25:00 <br /> Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 419.34 <br /> Production per Loader Operating Shift bcy 3,145 Max. prod. based on 100% avail. <br /> Production per Year bcy ~. ~ 820,863 Avg. production factored by evall. <br /> Wait Time er O eratin Hour min 44.25 <br /> 'r ' <br /> Availability % 92,50 <br /> Payload in Template bcy 25.00 ' <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bcy ~ 25.00 <br /> Production per Operating Hour bcy 113.34 <br /> Production per Loader Operating Shift bcy 786 <br /> Production per Year bcy 205,216 <br /> Queue Time st Loader miN Cycle 0.06 <br /> Spot Time at loader miN Cycle 0,00 <br /> Average Loading Time min/ Cycle 0,50 <br /> Average Travel Time miN Cycle 10.68 <br /> Spot Time at Dump miN Cycle 0.10 <br />- Average Dump Time miN Cycle 0.50 <br /> Average Cycle Time min/ Cycle 11.83 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes ~ 7.00 <br /> Production per Year bcy/Year 820,863 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates aflow~tor insuff icient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with t he truck queuing and maneuvering times. <br /> This simulation is based o n data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />• <br />Trapper <br />Prepared by: Ionia Perkins 4-Aug-2005 11:15 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.