My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />200560ND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining Inc, 2005 Haul Cycle: (PRJ] A92-i to LOM 118 (25,975 Cyds.) <br /> Material: PRJ Tb soil Roster: PRJ 5 da Week - 8 Hour Shifts <br /> e _:s ~ ~. <br /> Availability % 100.00 <br /> Average Buckei Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> ,Average Payload bcy 25.00 <br /> Operating Hours pet Year OpHr/Year 1,957.50 Op. hrs factored by avaitability <br /> Average Operating Shifts per Year shihs/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour' bcy 4,37.03 <br /> Production per Loader Operating Shift bay 3,278 Max. prod. based on 100%avail. <br /> production per Year bcy 855,484 Avg. production factored by avail. <br /> Wait Time er0 eratin ,Hour min 43.95 <br />• <br /> <br />Availability <br />% .r <br />92.50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 118.12 <br /> Production per Loader Operating Shift bcy 819 - <br /> Production per Year bcy 213,871 <br /> Queue Time at Loader min/ Cycle 0.05 <br /> Spot Time at loader ' min/ Cycle 0.00 <br /> Average Loading Time min/ Cycle 0.50 <br /> Average Travel Time min/ Cycle 10.19 <br /> Spot Time at Dump min/ Cycle 0.10 <br /> Average Dump Time min/ Cycle 0.50 <br /> Average Cycle Time min/ Cycle 11.34 <br /> Fleet Size 4 <br /> Ave ra a No. of Bucket Passes 1.00 <br /> Production per Year bcy/Year 855,484 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 FuIIBucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insuffi cient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br /> <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 11:14 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.