My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />200580ND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining Inc. 2005 Haul Cycle: [PRJj ZTS-1 to F Pit #3 (133,496 Cyds.) <br /> Material: PRJ To soil Roster: PRJ 5 da Week - 8 Hour Shifts <br /> <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 34.89 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 22.94 <br /> Operating Hours pet Yeaf OpHr/Year 1,957.50 Op. hrs factored by avallabiliry <br /> Average Operating Shifts per Year shitts/Year 261.00 Shifts factored~by availablllry <br /> Average Bucket Cycle Time min 0.50. <br /> Production per Operating Hour bcy 1,458.31 <br /> Production per Loader Operating Shift bGy~ 10,937 Max. prod. based on 100%avail. <br /> Production per Year bcy 2,654,638 Avg. productlon factored by avail. <br /> Wait Time er O eratin Hour min 22.15 <br /> Availability 9'° 92.50 <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year ~ 1,810.69 <br /> Average Payload bcy 22.94 <br /> Production per Operating Hour, bcy 394.14 ' <br /> Production per Loader Operating Shift bcy ~ 2,734 <br /> Production per Year bcy 713,659 <br /> Queue Time at Loader min/ Cycle 0.11 <br /> Spot Time at loader ~ miN Cycle 0.00 <br /> Average Loading Time min/ Cycle 0.00 <br /> Average Travel Time miN Cycle 2.44 <br /> Spot Time at Dump min/ Cycle 0.10 <br /> gverage Dump Time miN Cycle 0.50 <br /> Average Cycle Time miN Cycle 3.15 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> :, ~:.: - <br /> Production per Year bcy/Year 2,854,638 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with th e truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />~ 1 <br />`•_J <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 11:13 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.