My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />200580ND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining Inc. 2005 Haul Cycle: jPRJJ A97-f to F Pit #2 (57,172 Cytls.) <br /> Material: PRJ To soil Roster: PRJ 5 da Week - 8 Hour SNitts <br /> .r ~ i •. ® ® i ~ r. <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fitl Factor 0.72 <br /> Average Payload , bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts per Year shitts/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy . 831.00 <br /> Production per Loader Operating Shitt bcy 6,232 Max. prod. based on 100% avail. <br /> Production per Year bcy 1,626,677 Avg. production factored by avail. <br /> Wait Time er O eratin 'Hour min 36.97 <br /> Availability % 92.50 <br /> ' Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour' bcy 224.59 <br /> Production per Loader Operating Shift bcy 1,558 <br /> Production per Year bcy 406,669 <br /> Oueue Time at Loader miN Cycle 0.07 <br /> Spot Time at loader min/ Cycle 0.00 <br /> Average Loading Time miN Cycle 0.50 <br /> Average Travel Time min/ Cycle 4.84 <br /> Spot Time at Dump min/ Cycle 0.10 <br /> Average Dump Time min/ Cycle o.50 <br /> Average Cycle Time min/ Cycle 6.01 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> Production per Year bcy/Year 1,626,677 <br /> Discounted Capital Cost $/bcy 0.00 Loatling Methodology <br /> Discounted Operating Cosi $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insuffi cient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valitl for this site. <br /> <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 11:12 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.