My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />2005B0ND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining Inc. 2005 wl Cycle: [PR/] A96-1 to Mid AE Rd 81(51,197 Cyds,J <br /> Material: PRJ Tb soil Rosier: PRJ 5 de Week - 8 Hour Shifts <br /> . k ° p <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> .Average Payload <br />~ bcy 25.00 <br /> Operating Hours pet Year OpHr/Year 1,957.50 Op. hrs factoretl by availability <br /> Average Operating Shifts per Year shifts/Year 261.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour ~ bcy 1,197.50 <br /> Production per Loader Operating Shift bcy 8,981 Max. prod, based on 100°k avail. <br /> Production per Year bcy 2,344,111 Avg. production factored by avail. <br /> Wait Time er O eratin .Hour min 29.95 <br /> <br /> Availability °I° 92.50 , <br /> Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bcy 25.00 <br /> Production per Operating Hour bcy 323.65 <br /> Production per Loader Operating Shitt bcy 2,245 <br /> Production per Year bcy 586,028 <br /> Queue Time at Loader min/ Cycle 0.08 <br /> Spot Time at loader ~ miN Cycle 0.00 <br /> Average Loading Time min/ Cycle ~ 0.50 <br /> Average Travel Time min/ Cycle 3.00 <br /> Spot Time at Dump min/ Gycle 0.10 <br /> Average Dump Time min/ Cycle 0.50 <br /> Average Cycle Time min/ Cycle 4.18 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> ~' <br /> . .~ <br /> Production per Year bcy/Year 2,344,111 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insuffi cient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with th e truck queuing and maneuvering times. <br /> This simulation is based o n data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />• <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 11:07 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.