My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage Sysfem: Trapper Mining /nc. 2005 r! Cycle: (PRJJ A96-2 to North AE Rd ft2 (27,247 Cyds.J <br />. Material: PRJ To soil Rosfer: PRJ 5 da Week - 8 Hour Shifts <br /> g ~.:6 • t:. r. <br /> Availability % 100.00 <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,957.50 Op, hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 261.00 Shifts factored q' availability <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 1,079.99 <br /> Produption per Loader Operating Shift bcy 8,100 Max. prod. based on too°/ avail. <br /> Production per Year bcy 2,114,071 Avg, production factored by avail. <br /> Wait Time er 0 eratin Hour min 32.21 <br /> • :a <br /> Availability % 92.50 <br /> payload in~Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bcy 25.00 ' <br /> Production per Operating Hour bcy 291.89 ' <br /> Production per Loader Operating Shift bcy 2,025 <br /> Production per Year bcy 528,518 <br /> Queue Time at Loader min/ Cycle 0.08 <br /> Spot Time at loader miN Cycle 0.00 <br /> Average Loading Time. miN Cycle ~ 0.50 <br /> Average Travel Time min! Cycle 3.46 <br /> Spot Time at'Dump miN Cycle 0.10 <br /> Average Dump Time min/ Cycle 0.50 <br /> Average Cycle Time min/ Cycle 4.64 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1.00 <br /> r''~ r==' ° =' <br /> production per Year bcy/Year 2,114,071 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coi ncides with th e truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />• <br />Trapper <br />Prepared by: Tonia Perkins 4-Aug-2005 11:06 AM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.