My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2007-06-28_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:31 PM
Creation date
1/16/2008 1:02:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
6/28/2007
Section_Exhibit Name
Appendix A Part 2 TALPAC
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining <br />2005BOND <br />Talpac <br />2005 Bond Topsoil Replacement <br /> .. <br /> Haulage System: Trapper Mining inc. 2005 d Cycle: [PRJJ A92-3 to LOM Intersection (7,632 Cyds. <br /> <br />. Material: PRJ To soil Roster: PRJ 5 da Week - 8 Hour Shills <br /> r ~.s • r- <br /> Availability % 100.00 ' <br /> Average Bucket Volume cu.yards 38.02 <br /> Bucket Fill Factor 0.72 <br /> Average Payload bcy 25,00 <br /> Operating Hours par Year OpHr/Year 1,957.50 Op. hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 261.00 Shlffs factored by availabllfty <br /> Average Bucket Cycle Time min 0.50 <br /> Production per Operating Hour bcy 1,669.99 <br /> Production per Loader Operaling Shift bcy 12,525 Max. prod. based on 100%avail. <br /> Production per Year bi:y 3,269,012 Avg. productlon factored by avail. <br /> Wait Time er O eratin Hour min 20.70 <br /> Availability % 92.50 <br />' Payload in Template bcy 25.00 <br /> Operating Hours per Year OpHr/Year 1,810.69 <br /> Average Payload bGY 25.00 <br /> Production per Operating Hour bcy 451.35 <br /> Production per Loader Operating Shift bcy 3,131 <br /> Production per Year bcy 817,253 <br /> Queue Time at Loader miN Cycle 0.09 <br />• Spot Time at loader <br />Average Loading Time miN Cycle <br />miN Cycle 0.00 <br />0.50 <br /> Average TravePTime miN Cycle 1.82 <br /> Spot Time at Dump miN Cycle 0.10 <br /> Average Dump Time miN Cycle 0.50 <br /> Average Cycle Time min/ Cycle 3.01 <br /> Fleet Size 4 <br /> Avera a No. of Bucket Passes 1,00 <br /> Production per Year bcy/Year 3,269,012 <br /> Discounted Capital Cost $lbcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Double Sided <br /> Discounted Average Cost $/bcy 0.00 Full Bucket <br /> Average for 150 Shifts <br /> Productivity estimates allow for insufficient time at the end of the shift io complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it is valid for this site. <br />r1 <br />L~ <br />Prepared by: Tonia Perkins <br />Trapper <br />4-Aug-2005 1:20 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.