Laserfiche WebLink
SECTION 7.0 Miscellaneous <br />7.1 Vegetation Monitoring on Trapper Reclaimed Lands <br />Baseline vegetation monitoring on 598 acres of reclaimed Trapper rangelands in Ashmore, <br />Derringer, Flintlock, East Flintlock (Z), and Hawken pits that had been initially topsoiled and seeded <br />between 1996 and 2005 was accomplished during the 2006 field season. A total of 162 50-meter <br />transects were monitored. Vegetation parameters sampled during 2006 included ground cover, <br />species composition and woody stem density. <br />Vegetation monitoring planned for 2007 will include routine sampling of -new reclaimed areas and <br />selected older reclaimed areas. In addition, the first of two years of vegetation sampling will occur on <br />300 acres of reclaimed rangelands that will be included in an application for final bond release in <br />2008. The rangelands to be sampled for final bond release were reclaimed from 2006 through 2008 <br />and are located in Ashmore, Derringer and Hawken Pits. <br />7.2 Grazing of Reclaimed Lands <br />No cattle grazing occurred on Trapper reclaimed lands during 2006, nor is any planned for 2007. <br />7.3 2007 Revegetation Seed Mixes <br />Section 3.6.3.5 of Trapper's Mining and Reclamation permit requires the Division be notified of the <br />seed mixtures proposed to be used each year. Tables 7-1 through 7-4 give the 2007 proposed <br />mixtures. The Range Site A/B mixture (Table 7-1) was revised this year to put more emphasis on <br />less aggressive bunch grasses and to somewhat deemphasize rhizomatous wheat grass species. It is <br />hoped that this seed mixture change will result in better establishment of forbs and shrubs while still <br />maintaining a healthy and diverse presence of grass species. An experimental aerial interseeding <br />project is planned on approximately 60 acres of relatively recent reclaimed rangelands (Table 7-4). <br />Species included in the mixture are small-seeded shrub and forb species that would be expected to <br />be best adapted to an aerial seeding approach. <br />Required seed packing slips are attached behind Table 7-4 for shipments received in 2006. <br />7.4 Trapper Mine Facilities <br />In 2006, Trapper Mine facilities were not significantly changed during the reporting year. A portion of <br />power distribution line was relocated on the North end of Derringer Pit. The reroute was started in <br />late 2006 with the addition of poles and cable. In early 2007 the rerouted line was energized and a <br />section of existing line was removed on the North end of the pit. Also power distribution line was <br />extended in East Flintlock Pit for the Molly Brown dragline. <br />GCR 1/07 <br />(DRMS\05VEGte#7-0] <br />• <br />