Laserfiche WebLink
,, <br />~--' JAN 14 2008 v'"~ <br />,.~ ~'~'l <br />~ BATTLE MOUNTAIN RESOURCES INC. ~ Division or Keciamation, <br />~ ~~ _ _ ~ AAinina and Safetv <br />January 10, 2008 <br />~~ ~ :/ <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology ~~ <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />December 2007 Monthly Report ~/ <br />_- ., <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Ine. <br />(BMRI), San Luis Project for the month of December 2007. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on December 315`, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on December 315`. December tailing impoundment piezometer <br />measurements identified these installations were either dry or contained less than 12 inches of <br />water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements <br />collected for each of the site monitoring wells, piezometers and lysimeters as required by the <br />terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level.. The leak detection system was measured on <br />December 315`. The December tailings pond underdrain flow average was 43.42 gpm and a total <br />of 530 gallons of water was excavated from the leak detection system yielding a monthly average <br />of 16.06 gpad. <br />During December the West Pit water treatment plant operated efficiently discharging a total of <br />8,002,600 gallons (24.56 acre-feet) of water to Rito Seco Creek and a total of 428,200 gallons <br />(1.31 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />