Laserfiche WebLink
~6 ~. <br />~T'ATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources t ~~ ~ °~ c~`°~P, <br />Department of Natural Resources ~`=% <br />r ~• <br />1313 Sherman Street, Room 818 ~* <br />~l876 <br />Denver, Colorado 80203 <br />Phone 303-866-3581 <br />FAX 303-866-3589 2008 <br />January 8, Bill Ritter, Jr. <br />http://www.water.state.co.us Governor <br />Harris D. Sherman <br />Executive Director <br />Rachel Kullman <br />Clear Water Solutions Dick Wolfe, P.E. <br />State Engineer <br />8010 S. Country Road 5, Ste. 105 <br />Windsor, CO 80528 <br />RE: Substitute Water Supply Plan, NCCI Pit #1, M-2001-107 <br />Section 24, T2N, R67W, 6 P.M. <br />Water Division 1, Water District 2, Weld County R~C~~Q <br />Approval period: January 1, 2008 through December 31, 2008 JAN 1 4 2008 <br />Contact phone number for Ms. Rachel Kullman: 970-223-3706 pivislon ~;t Reclamation, <br />Mining and Safer <br />Dear Ms. Kullman: <br />We have received your letter of October 25, 2007, requesting renewal of the above <br />referenced substitute water supply plan to cover depletions caused by an existing gravel mining <br />operation operated by Northern Colorado Constructors, Inc. ("Applicant"). The required fee of <br />$257.00 for the renewal of this substitute supply plan ("SWSP") has been submitted (receipt no. <br />3622686). The original supply plan was approved on December 30, 2002 and the SWSP was <br />most recently renewed on October 27, 2006. <br />Plan Operation <br />This plan seeks to replace depletions resulting from mining at the NCCI Pit #1 ("NCCI <br />Pit"). There will be one dewatering trench around the active mining cell. Water from the trench <br />will be collected in a process water pond then pumped to a sedimentation pond. After <br />sedimentation, the water will be returned to Little Dry Creek where it will flow back to the South <br />Platte River. The total exposed water surface at the site is 2.73 acres. <br />In order to provide a buffer to neighboring wells from dewatering, the Applicant <br />constructed two recharge ditches on the southern end of the property. The Applicant will place <br />a portion of its dewatering water into these recharge ditches. <br />Depletions at the site will result from evaporation, water lost in mined product, concrete <br />production, asphalt production and dust control. The lagged depletions will be replaced using <br />three shares of Lupton Meadows Ditch Company and fully consumable effluent leased from the <br />City of Thornton ("Thornton"). <br />The reclamation plan for the NCCI Pit is to place a compacted clay liner around the <br />interior of the mine slopes for the purpose of preventing groundwater seepage from entering <br />the pit. The applicant has bonded for lining of the pit through the Colorado Division of <br />Reclamation Mining & Safety. <br />