Laserfiche WebLink
12.2007 Amended Table No. 3 <br />Lafarge West, Inc. <br />Combined South Platte River Substitute Supply Plan <br />(A) Total mining depletions from the mining sites. See Table No. 1. <br />(B) Total lagged historic consumptive use credit from recharge of 25 Fulton Ditch shares from Table No. 2 <br />(C) Total Depletions after Fulton credit and recharge has been applied. <br />(D) Transit losses of 5% from Metro WWTP to sites, (D)*0.05 <br />(E) Total winter replacements needed. (C)+(D) <br />(F) Total summer replacements needed. (C)+(D) <br />(G) Aurora Lease Total (includes transit losses). <br />C:\Documents and Settingsljmw\Local Settings\Temporery Internet Files\OLKt D\122007 AMENDED TABLE NO 3.xLv <br />Applegate <br />Group, ~~. <br />Prepared By: MLA <br />August 2007 <br />Combined South Platte River Water Ba/ante & Replacement Requirements <br />