Laserfiche WebLink
• <br />2.1.3 Production <br />No future production is planned. <br />2.1.4 Sequence <br />Surface Structures and Facilities <br />The facilities on the mine bench, which included a conveyor gantry and a small, <br />temporary mine ventilation fan, have been removed and reclaimed. No future <br />disturbance is planned for this operation. <br />Sequence of Mining <br />No future mining is planned for this operation. <br />r1 <br />LJ <br />2.1.5 Resource Recovery <br />No future mining is planned for this operation. <br />2.1.6 Subsidence <br />The existing entries were designed for use as primary access throughout the <br />initial projected life of mine. For this reason, care was taken to design an entry <br />configuration which would provide long-term stability. Convergence data and <br />observation of rib stability to date have shown no abnormal movement in the mine. <br />Present entry design allowed 60% of the area to remain in place as pillars. This will <br />eliminate the possibility of subsidence; therefore no subsidence monitoring was <br />planned for this permit term. <br />No structures or renewable resource lands exist over the mine entries. <br />1 • <br />Permit Renewal <br />2-3 <br />09103 <br />