Laserfiche WebLink
2.3.3 Water Requirements During Mining and Reclamation <br />Water is required for the control of fugitive dust along the haul road. Water <br />requirements for fugitive dust control are approximately 1500 gallons per day or 540,000 <br />gallons per year. There will be periods when no water will be required; thereby, reducing this <br />requirement by an indeterminate volume. <br />2.3.3.1 Water Rights <br />Water used in the mining and pollution control operations were obtained from the <br />McClane Canyon Mine dewatering system. <br />2.3.4 Sedimentation Controls <br />Surface runoff from the areas disturbed by the waste rock disposal area are routed to <br />a sediment pond or other approved structures. The ponds and ditches were designed in <br />accordance with applicable criteria. Discharge of water from the sediment pond is covered <br />by a CDPS permit. One new silt fence was placed in the berm that surrounds the reclaimed <br />lower topsoil stockpile area. The silt fence is designed so the outflow will not have more <br />than 0.5 ml/I of sediment. The drainage areas are shown on Page M(viii)-iii. <br />Mine Bench Area <br />Five new silt fences were strategically placed at the reclaimed bench as part of the <br />2007 reclamation efforts. Two of the silt fences were designed so their outflow will not have <br />more than 0.5 ml/I of sediment. The three additional silt fences were required to provide <br />drainage relief from low points in the berms. The drainage areas are shown on Page M(viii)- <br />1 iv. As shown on the figure, Ditch H bisects the area. Berms were installed on each side of <br />Ditch H to keep disturbed area run-off out of the ditches. In response to NOV CV-2007-003 <br />two additional silt fence segments were installed along each of the channel berms on the <br />east and west sides of Channel "H" berm. Additionally, a berm break and water bar were <br />installed to direct flow from an ephemeral channel into Channel "H". <br />Waste Rock Disposal Area <br />See section 2.2.5 Waste Rock Disposal Site. <br />• <br />RN-05 2-26 10/07 <br />