Laserfiche WebLink
<br />TABLE OF CONTENTS <br />PAGE N0. <br />• <br />• <br />4.05.4 Stream Channel Diversions (Relocation of <br /> Streams) and Stream Channel <br /> Reconstruction .......................... 4.05-11 <br />4.05.5 Sediment Control Measures .................... 4.05-12 <br />4.05.6 Sedimentation Ponds .......................... 4.05-14 <br />4.05.7 Discharge Structures ......................... 4.05-20 <br />4.05.8 Acid-Forming and Toxic-Forming Spoi1......... 4.05-20 <br />4.05.9 Permanent and Temporary Impoundments......... 4.05-21 <br />4.05.10 Underground Mine Entry and Access Discharges. 4.05-23 <br />4.05.11 Groundwater Protection ....................... 4.05-24 <br />4.05.12 Protection of Groundwater Recharge Capacity.. 4.05-24 <br />4.05.13 Surface and Groundwater Monitoring........... 4.05-25 <br />4.05.14 Transfer of Wells ............................ 4.05-26 <br />4.05.15 Water Rights and Replacement ................. 4.05-27 <br />4.05.16 Discharge of Water Into an Underground Mine.. 4.05-27 <br />4.05.17 Post-Mining Rehabilitation of Sedimentation <br /> Ponds, Diversions, Impoundments, and <br /> Treatment Facilities .................... 4.05-28 <br />4.05.18 Stream Buffer Zones .......................... 4.05-29 <br />4.06 TOPSOIL ...........................................4.06-1 <br />4.06.1 General Requirements .........................4.06-1 <br />4.06.2 Removal ......................................4.06-3 <br />4.06.3 Storage ......................................4.06-4 <br />4.06.4 Redistribution ...............................4.06-5 <br />4.06.5 Reconditioning ...............................4.06-6 <br />4,07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS.4.07-1 <br />4.07.1 General Requirements .........................4.07-1 <br />4.07.2 Temporary Sealing ............................4.01-1 <br />4.07.3 Permanent Sealing ............................4.07-1 <br />„'.. <br />v <br />