Laserfiche WebLink
Monitoring of monuments A, G, H and I on the City of Florence waterline was <br />eliminated when the corresponding sections of the waterline were abandoned. In <br />addition, the survey monuments for the Thompson Ranch structures were <br />relocated in 2002 to accommodate a change in survey method to a GPS system. <br />Regular monitoring of the identified monuments and structures was discontinued <br />at the end of 2003. In order to confirm and document long-term surface <br />subsidence effects, EFCI will conduct two additional subsidence surveys after <br />2003. One survey of the remaining Florence Waterline, Thompson Ranch, and <br />Newlin Creek monuments will be completed during year 3 (2006) of the <br />reclamation liability period. The second and final survey, during year 9 (2012) of <br />the reclamation liability period, will also include the high-resolution grid. Both <br />surveys will be documented by subsidence monitoring reports, copies of which <br />will be submitted to the CDMG. <br />TR-36 2.05.6-60a Revised -October 2003 <br />