Laserfiche WebLink
SNOWCAP COAL COMPANY, INC. <br />Table 13-1 <br />Permit Area Building and Structure Inventory Continued <br />~1 <br />L.J <br />I• <br />CAMEO REFUSE DISPOSAL AREA NO.3 <br />Building or Structure Construction Description <br /> Date <br />Sediment Pond No. 11 1994 Refer to Section 2.05.3(4) for details and <br /> a ndix 132 for desi n <br />Diversion Ditch Not Started Refer to Section 2.05.3(4) for details and <br /> a ndix 13.2 for desi n <br />NW Collection Ditch Not Started Refer to Section 2.05.3(4) for details and <br /> a endix 13.2 for desi n <br />SE Collection Ditch Not Started Refer to Section 2.05.3(4) for details and <br /> a endix 13.2 for desi n <br />Haul Road 4 Not Started 900' gravel road with culvert at CRDA No. 3 and <br /> three 30" culverts at Coal Gulch <br />2 WEST PORTAL <br />Building or Structure Construction Description <br /> Date <br />Access Road No. 3 1992 8200' single land dirt road with two 18" CMP, two <br /> 24" CMP, and one 12" CMP installed near the 2 <br /> West ortals. CMP's removed 2000. <br />Powerline 1992 10100' of 25KV, 3 phase, single pole structure <br /> with cross arms and raptor protectors. Pole <br /> spacing generally 250 to 300 feet. Removed <br /> 2001 & 2002. <br />S-Substation 1992 40'x40' fenced area with 30'x30'x8" concrete pad. <br /> 5 transformers and associated switch gear <br /> relocated from North DeGine At Substation. <br /> Approximately 330' of buried cable will be <br /> installed to connect the substation with the mine. <br /> Removed 2001. <br />Compressor Station Not Completed 20'x40' fenced area adjacent to S-Substation with <br /> 10'x20'x8" concrete pad covered with a <br /> corrugated metal shed type roof. One or more <br /> compressors may be located on the pad. <br /> Approximately 300' of 4" steel pipe will be buried <br /> along the road to connect the compressor station <br /> with the mine. Removed 2001 <br />T13-1-8 <br />(Rev 10/OS) <br />