Laserfiche WebLink
• <br />The recoverable reserves have not been adjusted for any coal processing. <br />Powderhorn Coal Company intends to process the minimum amount of coal <br />necessary to produce a marketable product. <br />MAPS AND CROSS SECTIONS <br />This section lists the maps and cross sections that have been developed <br /> <br />for the Cameo C Seam mining area in the Roadside North Mine. No quality <br />isopach maps have been developed due to the limited data, i. e. one hole. No <br />new cross sections have been developed since the data is shown on the cross <br />sections in the current Resource Recovery and Protection Plan. These cross <br />sections are incorporated into this appendix by reference. <br />The maps developed for the Cameo C Seam mining area in the Roadside <br />North Mine are: <br />Figure 5 - 1 Cameo "C" Seam Thickness Isopach with Mine Plan <br />Figure 5 • 2 Cameo C Seam Structural Contour Map <br />Figure 5 - 3 Overburden Isopach With Subsidence Protection Zones <br />Figure 5 - 4 Cameo B Seam Thickness Isopach with Mine Plan <br />Figure 5 - 5 Interburden Isopach Cameo "B" to Cameo "C" <br />Figure 5 - 6 Cameo C Seam Mine Plan Timing <br />PHCC R2P2 <br />Page 10 <br />2-28-99 <br />