My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-08_PERMIT FILE - C1981041A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041A
>
2007-11-08_PERMIT FILE - C1981041A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:20 PM
Creation date
1/11/2008 1:03:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
11/8/2007
Section_Exhibit Name
Tab 12 Operation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was then turned on strike and finally up dip allowing the water to run away from the <br />. _ working faces which improved mining conditions. <br />The amount of water coming into the C seam mine works was not accurately <br />measured before pumping into the mine de-watering system for discharge with water <br />from the B seam. Analysis of discharge records for a three year period December to <br />May is shown below. <br />PERIOD TOTAL(oal) GAUDAY GAUMIN <br />12/96705/97 21,626,200 141,348 98.2 <br />12/97 TO 5/98 17,984,000 116,779 81.1 <br />12/99 TO 5/99 16,112,900 103,287 71.7 <br />The total amount of water discharged from the mine decreased. Other factors . <br />influence the decrease in discharge but it appears that no increase in mine water <br />discharge occurred while mining the C seam. Mining the C seam rather than the B <br />• seam had no additional impact on the hydrologic regime of the area. <br />Geo-chemistry <br />Chemical analysis of the coal, roof and floor is contained in Figures 6-3 through <br />6-5 in Tab 6. Since the Operator mined in-seam to be economically viable, little out of <br />seam dilution of the coal was washed. The mine design shown on Figure 5-1 did not <br />require the use of overcasts to ventilate the mining panels; therefore, no roof rock was <br />intentionally generated. Little, if any, of the roof or floor was sent to the surface for <br />disposal. <br />• <br />Volume 3 Tab 12 12-7 12/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.