My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-08_PERMIT FILE - C1981041A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041A
>
2007-11-08_PERMIT FILE - C1981041A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:20 PM
Creation date
1/11/2008 1:03:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
11/8/2007
Section_Exhibit Name
Tab 12 Operation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• north. The dikes are lithologically identical co the Rollins sandstone, <br />crhich is the source of the material. Hopefully they will not be a <br />• <br />hinderance to Longwell type mining techniques. <br />The Cameo ranges from 5.66 to 9.51 feet in thickness, averaging <br />7,61 feet. It is thickest in the north part of the lease, and appears <br />to thin to the southeast. These thicknesses include bony coal and <br />siltstone partings where present. The following table shows individual <br />thicknesses and depths determined by drilling: <br />]]ole No. Thickness, ft. Depth, ft. <br />CC-76-1 9.39 376.57 <br />CC-76-2 9.24 579.00 <br />CC-76-3 7.37 416.35 <br />CC-76-4 6.50 (e-log} 797.40 <br />CC-76-5 9.51 107.55 <br />CC-76-6 8.53 168.42 <br />CC-76-7 7.00 641.61 <br />CC-77-1 5.97 868.28 <br />CC-77-2 5.66 1,302.10 <br />Average Thickness 7.61 <br />Quality of the Cameo average as follows: <br />Moisture, as received 7.68% <br />Btu, as received 10,224 <br />Ash, dry 19.71"/. <br />Volatile Matter, dry 35.85% <br />Fixed Carbon, dry 44.43% <br />Btu, dry 11,082 <br />Sulfur, dry 0.92% <br />FSZ 1 <br />C (dry 63.17% <br />H (dry) 4.51% <br />N (dry) 1.35Y. <br />C1 (dry) 0.01% <br />0 (dry) 10.32% <br />"Reserve Base" estimates were calculated in accordance with General <br />Plining Order No. 1. The "Coal Reserve Base "'.ap" shows the location of <br />• drill Boles wt,ich were used Co calculate tonnnses. A work map has been <br />included which sf,ows how ti,e lease was divided into sections so acreages <br />could l,e obtained. Tlie "Coil Recovery Chart - Reserve Base" shows eacl, <br />
The URL can be used to link to this page
Your browser does not support the video tag.