Laserfiche WebLink
<br />LIST OF ATTACHMENTS <br />• (Continued) <br />Attachment No. <br />13-12 Pit Slope Stability Analysis <br /> LIST OF F~CHIBITS <br /> Exhibit No. <br /> 13-1 Facilities Map <br /> 13-2 Surface Hydrology <br /> 13-2A Eliminated <br /> 13-3 Surface Water Control Plan -Tie-Across Haul Road <br /> 13-4 Watershed Boundary Partial <br /> 13-5 Proposed Sedimentation Pond 005 <br /> 135A Pond 005 As-Built <br /> 13-6 Pond 006 Phase II As-Bui0 <br /> 13-6A Pond 006 Phase IV Subwatershed Map <br /> 13-68 Pond 006 Phase IV Design <br /> 13-6C Pond 006 Phase IV Pre-Settling Basin Design <br /> 13-6D Pond 006 Phase V Subwatershed Map <br /> 13-7 Proposed Sedimentation Pond 009 <br />• 137A Sedimentation Pond 009 As-Built <br /> 138 Proposed Sedimentation Pond 015 (2 sheets) <br /> 138A Proposed Sedimentation Pond 016 (2 sheets) <br /> 13-fiB Proposed Sedimentation Pond 017 (2 sheets) <br /> 138C Pond 016 & 016A Watershed Boundary <br /> 138PP Topsoil Stockpile PP Sumps PP-S1 and PP-S2 (As-Built) <br /> 13-640 Topsoil Stockpile OO Sump OO-St (As-Built) <br /> 138RR Topsoil Stockpile RR Sump RR-S1 (As-Built) <br /> 139 Pond 15 As-Built <br /> 139A Pond 16 As-Built <br /> 13-9B Pond 016 Design Revision <br /> 13-9C Pond 016A (As-Built) <br /> 13-9D Pond 017 (AS Built) <br /> 13-9E Pond 016 & 016A Two-Pond System As-Built Watershed Boundary <br /> 13-10 Typical Road Details <br /> 13-11.1-11.8 Tie-Across Haul Road (As-Built) <br /> 13-12.1-12.4 Mine Entrance Haul Road (As-Built) <br /> 13-13.1-13.5 Haul Road A (As-Built) <br /> 13-14.1-14.3 Haul Road B <br /> 13-15.1-15.2 Haul Road C <br />• 1316.1-16.2 Reserved <br /> 1317.1 Reserved <br /> TR-56 iii <br />Revised 01!06 <br />