My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1980004 (8)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980004
>
_INSPECTION - C1980004 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 8:02:53 AM
Creation date
1/11/2008 9:39:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
12/13/2007
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> General Comments <br /> This was an aerial inspection of McClane Canyon Mine. The flight was on 12/13/07. Harry Ranney of DRMS <br /> recorded 6 near vertical digital images, covering the mine facilities from the portal area down to the office <br /> location. There was a solid cover of fresh snow in all non-travelled areas, and it appeared to be snowing at the <br /> time of the flight. These conditions made detailed observations difficult. <br /> Although details were difficult to discern, it did appear that disturbances were properly contained within approved <br /> disturbed area boundaries and sediment control systems, and no problems were evident. <br /> Minor Revision No. 44, allowing expansion of the sediment cleanout/coal waste temporary storage area near the <br /> sediment pond has been approved and required bond was submitted to the Division on December 18, 2007. As <br /> such, the operator is now authorized to initiate the project. The project work had not yet been initiated when the <br /> flight was made on December 13. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.