Laserfiche WebLink
West Elk Mine 2006 Annual Hydrology Report 8 <br />Table 2 <br />Laboratory Parameters <br />Baseline and First 5 years of Sampling <br />• <br />S rin s/Surface Water <br />H lab and field Sodium a+ <br />Conductivit at 25 C (lab and field) Sulfate (SO4_) <br />Temperature (field) Aluminum (Al) <br />Total Dissolved Solids Arsenic (As) (Total Recoverable) <br />Total Sus ended Solids Cadmium (Cd) <br />Sodium Adso tion Ratio (SAR) Co er (Cu) <br />Bicarbonate (HCO3) Iron (Fe) (Total and Dissolved) <br />Calcium (Ca+) Lead (Pb) <br />Chloride (Cl-) Manganese (Mn) (Total and Dissolved) <br />Hardness Mercur (Hg) (Total Recoverable) <br />Ma nesium (Mg+) Molybdenum (Mo) <br />Nitrate -Nitrite Selenium (Se) (Total Recoverable) <br />Phos hate (PO4 as P) Zinc (Zn) <br />Potassium Boron (B) <br />Groundwater <br />H lab and field) Nitrate-Nitrite <br />Conductivity at 25 C (lab and field) Phos hate (PO4 as P) <br />Temperature (field) Potassium <br />Total Dissolved Solids Turbidi <br />Sodium Adso tion Ratio (SAR) Sodium (Na) <br />Bicarbonate (HCO3-) Sulfate (SO4 ) <br />Calcium (Ca+) Arsenic (As) <br />Carbonate (CO3) Cadmium (Cd) <br />Chloride (Cl-) Iron (Fe) (Total and Dissolved) <br />Hardness Man anew (Mn) (Total and dissolved) <br />Ma nesium (Mg+) Lead (Pb) <br />Ammonia (NH3) Mercury (H ) <br />Selenium (Se) Zinc (Zn) <br /> Boron (B) <br />Notes: <br />1. Parameters monitored as a result of PR-10 <br />2. Added to baseline analyses in 1996. Not for analyses completed prior to 1996. <br />3. All arameters will be analyzed for their dissolved form unless stated otherwise. <br />3.1 Surface Water Monitoring <br />The West Elk Mine is drained to the north by the North Fork, to the south by Minnesota Creek, to <br />the west by Gribble Gulch, and to the east by Deep Creek. The surface water monitoring system <br />for the Project includes 23 stream stations, comprised of 10 sites with continuous recording devices <br />and 13 sites with instantaneous flow measuring devices. <br />In WY 2006 two new monitoring stations, Deep Creek Ditch and Minnesota Reservoir Flume, <br />were added to the monitoring program in order to provide baseline monitoring data in anticipation <br />of the Project's potential future plans for the longwall mining in the South of the Divide permit <br />December 2007 HydroGeo, Inc. <br />