Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2007 <br />Mine Name: CARBON JUNCTION MINE Permit Number: C-92-080 Permittee: OAKRIDGE ENERGY <br />Address: 4613 Jacksboro Highway, Wichita Falls, Texas 76301 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of all of the areas reported <br />should be clearly depided on a map inGuded with the report. <br /> <br />Land Status Category Last Years <br />Cumulative This Calendar + <br />Cumulative Total <br /> Year <br /> Total <br />Acres Disturbed 37.61 + 0.0 = 37.61 <br />Acres Backfilled 8 Graded 33.37 + 0.0 = 33.37 <br />Acres topsoiled 33.37 + 0.0 = 33.37 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for each <br />category below. Do not inGude acres that have achieved final, Phase III release. <br /> Last Years This Cumulative <10 >10 <br /> Cumulative Calendar + <br />Total <br />years <br />years <br /> Total Year <br />Acres 33.37 + 0.0 + 33.37 = 33.37 + 0.0 <br />seeded <br />* Include, if necessary, a description of any augmented seeding or cultural practices. <br />For the Entire Life of Mine, the total number of acres disturbed 59.0 acres and the total number of acres: <br />Phase I released: 61.21 ac. Phase II released: 61.21 ac. Phase III released: 61.21 ac. (SL-02) <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 11.94 acres <br />(Ponds 001, 002 and Topsoil Stockpiles 4,7, and 8) <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities2 11.94 acres <br />(Ponds 001, 002 and Topsoil Stockpiles 4,7, and 8) <br />Acreage in active mining areas3 0.00 aches <br />+~exctude areas where Phase III release has been achieved <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monftoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and non-coal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />s Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />