Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 12/22/07 <br />Weather Conditions: Clear, Calm, 20 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs Fi <br />p EC <br />umhos/cm Tem C <br />p ~ ~ <br />SW-1 1:00 PM 0.01 - - - <br />SW-2 1:30 PM Dry - - - <br />SW-3 11:30 AM Dry - - - <br />SW-4 1:15 PM Dry - - - <br />SW-5 11:35 AM Dry - - - <br />SW-6 11:30 AM Dry - - <br />SW-7 11:30 AM Dry - - - <br />SW-8 1:05 PM 0.01 - - - <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet Fi <br />p EC <br />umhos/cm Tem C <br />p ~ ~ <br />GW-1 11:58 AM 12.5 8.4 8000 9.6 <br />GW-3 11:35 AM 37.3 7.3 4500 12.3 <br />GW-6 11:00 AM Dry-18.8' <br />GW-9 12:45 PM 26.1 7.2 9200 13.9 <br />Location of Points/Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2007 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. <br />GW-9 Total Depth 53.5 ' <br />b'b ~bg <br />SW-1 & SW-8 had flow below ice cover. No field parameters or sample obtained. ~ <br />