My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-07_GENERAL DOCUMENTS - M1989056
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1989056
>
2008-01-07_GENERAL DOCUMENTS - M1989056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:39 PM
Creation date
1/8/2008 9:53:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/7/2008
Doc Name
Complaint Ltr
From
Judy Kehn
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Don Kehn <br />Construction Inc. <br />GENERfLL CONTRACTORS <br />January 26, 2006 <br />Division of Mineral and Geology <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />RE: Timuath Pit, DMG #M-89-056 <br />RECE6'~!E® <br />JAN 312006 <br />8ivieinn at Mioerela and Geology <br />In reference to ow mining operation at the Tiamath pit, we have enclosed a map and a <br />check for the armual fee. <br />We are continuing in work in Phase lA as shown on the map, listed as Exhibit G2. The <br />sand processing plant remains as previous on top of deposits yet to be mined. The <br />crusher remains at the site indicated. <br />Permanent wetlands have been reclaimed from areas in Phase IA, Phase IC, and Phase <br />1B as indicated upon completion of mining. Permanent wetlands are continuing to be <br />developed in areas of Phase IA. <br />We wilt continue mining in phase 1B We wilt not completely mine Phase IB at this <br />time due to our reluctance to disturb the t7eek and adjoining wetlands in the north end of <br />the aura. <br />We will move the sand plant and cnuher to Phase II in 2006. <br />Material mined from Phase IA and Phase IB will be processed fast, then m;Ding will <br />begin in Phase II. Overburden from Phase II will be used to backfill Phase lA so that <br />Permanent wetlands can be completed. Wetland seeding and the planting of wetland <br />species will take place. <br />Groundwater monitoring wells are in Place up gradiem of the property as shown on the <br />attached map, Exhibit G3. Quarterly reports are attached. <br />Si(n~cerely, <br />25Ja.~~Lc.Q-~ <br />Dan Kehn <br />Enclosures <br />6550 So. County Road 5 • Fort Collins, Colorado 80528 • Phone (970) 228-4111 • FAX (970) 228-4115 <br />807 Munay Aoad • Cheyenne, Wyoming 82007 • Phone (30'7) 632-40pp • FAX (307) 632.4016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.