Laserfiche WebLink
Current accepted wetlands by Corp of Engineers: <br />Undisturbed 20.14 acres <br />Shallow water 3.64 acres <br />Open water 10.65 acres <br />Wet meadow 1 ].47 acres <br />Current accepted 45.9 acres <br />Required threshold standard 63.8 acres <br />Wetlands acreage curremly deficiert 17.9 acres <br />Requiring possible rework to become viable 17.9 acres <br />Balance of wetlands developing which require <br />possible rework . 33.92 acres <br />Total developing wetlands requiring possible <br />rework 51.82 acres <br />No additional wetlands may be mined umil the 17.9 acres deficient are delivered as viable wetlands per <br />the Corp. <br />Cost of Tabor and plantings to rework wetlands <br />51.82 acres Q $830.00 <br />Cost to move dirt to construct wetlands <br />Dirt moving per acre -includes barrow <br />9680 cy ~ $3.00 $29,040.00 <br />Cost of seed, plantings and labor for wetlands from <br />bare ground per acre $ 1.460.00 <br />Total development costs per acre wetland $30,500.00 <br />Remaining wetland acreage to be wnstntcted <br />66.82 acres x $30,500.00 <br />Fst. remaining costs to finish required wetlands <br />I <br />i <br />Minabi a Area -Per King Surveyors <br />I Area IB + 1C (Depth =10.2') = 177,086 cy (cubic yams) <br />Area lA (Depth = 9.0') = 160,962 cy <br />Area 2 w/office (Depth =10.2') = 1.947.701 cy <br />& shop <br />Total Minable 2,285,749 cy <br />$ 43,010.60 <br />$2.038.010.00 <br />$2,081,020.60 <br /> <br />