My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-02_GENERAL DOCUMENTS - M1978091UG
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1978091
>
2008-01-02_GENERAL DOCUMENTS - M1978091UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:26 PM
Creation date
1/8/2008 9:52:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/2/2008
Doc Name
Termination of Noncompliance Order
From
BLM
To
Gault Group, Inc.
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNITED STATES DEPARTMENT OF THE INTERIOR <br />i_ Bureau of Land Management <br />Gunnison Field Office <br />216 N. Colorado <br />Gunnison, CO 81230 <br />970-641-0471 <br />Certified Mail # 7005 1160 0000 2320 6405 <br />Return Receiut Requested <br />Effective Date is Date of Delivery <br />~~~~d <br />42~~~$ <br />N <br />~P ~~ <br />,. ~w~8am~p° % <br />Gas'=.' , ~ds~e~'! <br />In Reply Refer To: <br />COC-70513/ 3809 <br />~1-0~ WoNpsjZ vtnlrlE " <br />~C-a <br />,~ <br />'~ <br />Steve Glass M - 19 } g - 0 9 I u C-~ , <br />~'."- Gault Group, Inc. ~ EtECEIVED <br />~ 36 West Main Street <br />Cortez, CO 81321 / .IAN ~ ~ 2()()a <br />~ / u~~~s~on of Reclamation, <br />Re• Termination of Noncompliance Order effective date of November 10 2007 Mining and Safety <br />Based on a review of the submitted information, the Noncompliance Order, effective November <br />10, 2007, extended December 9, 2007, will be terminated subject to the following conditions: <br />The amount of material and the site for the relocation of materials will need to be determined <br />during the onsite meeting in the spring of 2008 in order to prevent unnecessary or undue <br />degradation of public lands. <br />The delineation of the channel will be determined during the onsite meeting in the spring of 2008 <br />to determine whether the channel centerline or the ordinary high water mark on the mine side of <br />the original drainage will be used. <br />Once the volume of materials to be moved is established, adherence to an established timeframe <br />(quantities to be relocated during a specific period of time) for completion of the mitigation will <br />be followed, with a completion date in the fall of 2009. This date allows for two full seasons <br />when groundwater flows/levels would be anticipated to be at a minimum. <br />r~~:_ <br />Kenny <br />Field Office Manager <br />cc: Bob Oswald, Colorado DBMS, 701 Camino del Rio Room 3 ] 5, Durango CO 81301 <br />Kye Abraham, LKA International, Inc., 3724 47`~ St. Ct. NW, Gig Harbor, WA 98335 <br />
The URL can be used to link to this page
Your browser does not support the video tag.