My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-26_PERMIT FILE - M2007067
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007067
>
2007-12-26_PERMIT FILE - M2007067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:16 PM
Creation date
1/3/2008 2:34:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007067
IBM Index Class Name
PERMIT FILE
Doc Date
12/26/2007
Doc Name
Reclamation costs estimate update
From
DRMS
To
Cordilleran Compliance Services Inc.
Email Name
CBM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS - - - _ <br /> <br /> <br />Depreciation <br />Ownership Costs <br /> <br />CFC ___ <br /> <br /> <br />Overhead <br /> <br />Overhaul <br />Labor Parts ,_ -_ ? <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel ' -_ <br /> <br /> <br />Lube <br /> <br /> <br />ires - <br />sheet 2 of 2 <br /> <br />G.E.C. <br />Acquisition cost : $18.23 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $18.23 NA NA $7.24 $13.57 $8.05 $13.09 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.50 $12.34 $1729 NA NA NA NA NA NA NA NA <br />Double shifts : $20.62 $6.17 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.34 $4. t 1 $5.76 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $5.65 NA $6.28 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/tube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $5.97 $0.00 $2.01 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br /> <br />DJUSTED COST SUBTOTALS <br /> <br /> <br />Dozer, ROPS and Attachment no. 2 : <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts <br />Dozer and ROPS Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires <br /> <br />G.E.C. <br />Single shifts : $27.50 $12.34 $17.29 $5.65 $13.57 $6.28 $13.09 $30.56 $5.97 $0.00 $2.01 <br />Double shifts : $20.62 $6.17 $8.64 ttachment no. 2 <br />Triple shifts : $18.34 $4.11 $5.76 $0.94 $1.30 $1.72 $1.31 $0.00 $0.34 $0.00 $1.09 <br />HOURLY OPERATOR WAGES Base Fringe F.LC.A. Unempl TWk.Comp. Total - <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp) <br />Dozer operator (>=70hp) $20.67 <br />$20.67 $722 <br />$7.22 $1.58 <br />$1.58 $1.28 <br />$1.28 $2.03 <br />$2.03 $32.78 <br />$32.78 Day : <br />Swing : $0.00 <br />$0.30 Two shift per day average : <br />Three shift per day average : $0.15 <br />$0.25 <br />Mechani $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />RLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />CosUhr ($) <br />Single shifts : $57.13 $77.13 $6.71 $32.78 $173.74 <br />Double shifts : $35.44 $77.13 $6.71 $32.93 $152.20 <br />Triple shifts : $28.21 $77.13 $6.71 $33.03 $145.07 <br /> <br />EQUIPMENT PERFORMANCE DATA Horsepower Transmission Weight Length Width Height Fuel Ripper <br /> Description (FHP) Type (UST) (ft) (ft) (ft) type type <br />Dozer : Cat D8R Series 11 - 8SU (2 310 NA 4 i.8 22.7 8.7 11.5 diesel NA <br />Blade : Semi-Universal NA NA 5.4 NA 12.9 5.5 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br /> Total weight : 52.5 (UST) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.