Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />QUARTERLY POND INSPECTION REPORT <br />THE PITTSBURG 8~ MIDWAY COAL MINING CO. <br />EDNA MINE <br />Pond Identification: CHECK DAM #12 <br />Type Of Pond: EARTHEN CHECK DAM STRUCTURE <br />Operational Status At Time of Inspection <br />Approximate Water Level: 0.5 feet below discharge elevation <br />Sediment Level (%) Total Storage: Estimated at ZO% of sagacity <br />Outflow (cfs): 0 <br />Cw..i.. <br />ctat~ ~~ <br />Comments <br />Erosional: <br />Rills 8 Gullies On Embankment OK <br />Vegetation OK <br />Outlet Channels OK <br />Other N/A <br />Pond Structure: <br />Settling OK <br />Cracks Or Slides OK <br />Seepage OK <br />Other N/A <br />Appurtenant Structures: <br />Primary Spillway OK <br />Secondary Spillway N/A No Secondary Spillway <br />Other N/A <br />Additional Comments: <br />Structure is functioning as designed. <br />Inspected By: <br />Chris Miller <br />Date: November 15, 2007 <br />