Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during <br /> the inspection. Comments also describe any enforcement actions taken during the inspection and the <br /> facts or evidence supporting the enforcement action. <br /> This was a partial inspection conducted by Tom Kaldenbach of DRMS. Henry Barbe of Mountain <br /> Coal Company represented the operator. The ground was covered with less than one foot of snow. <br /> With the operator's consent,this report was issued from the Denver office of DRMS. <br /> The longwall was active in Panel 21. Development work was in progress for panel E-1. <br /> Roads <br /> Snow cover limited inspection of road surfaces, embankments, and road ditches and culverts, but they <br /> appeared in good repair in the main surface facilities area and in Sylvester Gulch. <br /> Processing Waste <br /> The faces of the Refuse Pile Expansion pile and the Lower Refuse Pile showed no evidence of <br /> structural instability. Survey markers were in place on the faces of both piles. The top of the Lower <br /> Pile is being used for equipment storage, as approved. <br /> Support Facilities <br /> No problems were found at the shaft sites in Sylvester Gulch or at the Shaft 3 site. <br /> Documents Received <br /> No documents were received during the inspection. <br /> 3 <br />