Laserfiche WebLink
6 <br />3. .Describe the estimated topsoil depdt and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />4. Describe how drill holes will be plugged (refer to Ruie 5.4 of the Rules far required abandonment procedures): <br />Not applicabl -- <br />5. Describe how portals, edits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division far closure specifications. <br />removable only with heavv ~ ~i f._._tyi.n..~~_~~,~; ~mPn+ <br />fi. Describe haw roads will be reclaimed ar returned to their pre-praspecting (or better) condition: <br />Roads are existing___a_nd accepted ~.y _th~~aarr_erit`1and~-.o~.~~._.._. - <br />