Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />October 2007 Monthly Report <br />Page 3 <br />Table 2 -0ctober 2007 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 10/31/07 41.69 41.71 0.02 <br />P13 10/31/0? 40.98 41.34 0.36 <br />P14 10!31/07 41.24 0.00 <br />P15 10/31/07 D 41.10 0.00 <br />Table 3 below provides the calendar year 2007 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />October 2006 242 tons Sludge transferred from Pond #3 to drying <br /> ad. <br />March 2007 242 tons Sludge transferred from drying pad to tailings <br /> im oundment. <br />May 2007 144 tons Sludge transferred from Pond #3 to drying <br /> ad. <br />August 2007 144 tons Sludge transferred from drying pad to tailings <br /> im undment. <br />October 2007 Sludge transferred from Pond #3 to drying <br /> ad. <br />Should you have an questions or comments, please do not hesitate to contact either myself (719} <br />379-0798 or Mr. ill yle (303) 324-2630 or (970) 325-4482. <br />Coordinator III <br />Cc: Bill Lyle <br />File <br />