My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-23_PERMIT FILE - x200720511
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200720511
>
2007-08-23_PERMIT FILE - x200720511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:49 PM
Creation date
12/18/2007 2:11:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
x200720511
IBM Index Class Name
PERMIT FILE
Doc Date
8/23/2007
Doc Name
E-mail Regarding Cost Estimate
From
Dan Hernandez
To
Peabody Energy
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTEROFFICE MEMORANDUM <br />TO: DAN HERNANDEZ <br />FROM: JANET BINNS <br />SUBJECT: NOI X-2007-205-11 RECLr1MATION COST ESTIMATE: REVISED TO REMOVE TWINNED HOLES <br />DATE: 8/23/07 <br />I have revised the reclamation cost estimate for NOI application X-2007-205-11, for the Wolf Creek Exploration <br />project submitted by Twentymile Coal Company. <br />The applicant proposes to drill two holes, and construct two drill pads. The diameter of the drill holes will be 6.25". <br />The average drill hole depth is projected to be 1125 ft. deep. TCC states that, drill pads will be accessed from existing <br />roads and no new roads are required to be constructed. The holes will not be twinned under this NOI application. <br />Each pad may have up to three small mud pits during the drilling process. Reclamation of the drill pads will consist of <br />sealing the drill holes with cement and surgel, marking each hole, drying and regrading all mudpits, regrading both drill <br />pads, replacing topsoil on the regarded pads, and seeding the pads. <br />TCC estimated cost for reclamation of the proposed holes is $7,953.00. The Division's estimated cost for reclamation <br />of four holes and the two associated pads is $7,667.00. TCC's estimate exceeds the Division's by $286.00. The Division <br />is can accept TCC's estimate. Please find my supporting CIRCES estimating task sheets attached to this memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.