My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-14_PERMIT FILE - X200722800
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200722800
>
2007-12-14_PERMIT FILE - X200722800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:31 PM
Creation date
12/18/2007 2:10:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200722800
IBM Index Class Name
PERMIT FILE
Doc Date
12/14/2007
Doc Name
180 Day Report
From
Dan Hernandez
To
Jason Musick
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6: <br />~i <br />COLORADO DIVISION OF NIINERALS AND GEOLOGY <br />~ 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />COAL EXPLORATION 180-DAY REPORT <br />Prospector: Ark Land Company <br />Address: P' . 0 . pox 5 91 <br />Somerset, ~^O 81434 <br />Notice of Intent No.: X- 2 0 0 7 -? ? 8- O Q <br />Project Name: Grand Valley Book Cliffs <br />County: Garfield <br />Date: December 14, ;'007 <br />This report is filed in accordance with Rule 2.02.6(3}(a) of the Regulations of the Colorado Mined <br />Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado Surface Coal <br />Mining Act, C.R.S. 34-33-101 et seq. The purpose of this report is to update the Division on <br />exploration and reclamation activates that have occurred in the past 180 days of active prospecting. <br />The report also indicates any changes in operations from what was stated in the original Notice of <br />Intent sent to the Division. The Operator may use this form, modify this form, or use a different <br />format altogether. <br />1. Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 days. <br />Mention sealing and plugging, regrading, retopsoiling and reseeding activities. <br />(Attach additional pages, if needed.) <br />See Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.