My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-17_ENFORCEMENT - C1996083 (2)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1996083
>
2007-12-17_ENFORCEMENT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:33 PM
Creation date
12/18/2007 2:10:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
ENFORCEMENT
Doc Date
12/17/2007
Doc Name
Abatement Extension Request
From
J.E. Stover & Associates Inc
To
DRMS
Violation No.
CV2007006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />~IS~~I~I~I~D <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />December 13, 2007 <br />OFC 17 2001 <br />Division o7 Keciamation, <br />Mining and Safety <br />J. J. Dudash <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Excess Rock, NOV CV-2007-006 <br />Extend Abatement Deadline <br />Permit C-1996-083 <br />Dear Mr. Dudash: <br />The referenced notice of violation was written for failure to confine surface coal mining <br />and reclamation operations to lands within the permit area. The final abatement <br />deadline is 5 p.m. December 17, 2007. <br />One of the abatement steps is to transport the excess rock from the Paonia water <br />pollution control facility to the Bowie #1 Mine as approved in MR-83 or obtain Division <br />approval through a technical revision to keep the excess rock where it is. By letter <br />dated December 5, 2007, BRL submitted a technical revision application to the DRMS <br />to obtain approval to keep the excess rock at the Paonia water pollution control facility. <br />It is unlikely the DRMS will be able to approve the technical revision application by the <br />December 17th abatement deadline. Additionally, if the technical revision application is <br />denied, it will not be possible for BRL to move the rock to the Bowie No. 1 Mine by the <br />December 17th deadline. <br />For the reasons explained above, please extend the abatement deadline for the <br />referenced NOV until January 18, 2008. <br />Sincerely, <br />~~4~~ , <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.