Laserfiche WebLink
<br />~ <br />,~ r D~ <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br /> <br />~~ <br />~ ~ ~~ <br />~;°F rn`O\ <br />'~' <br />= <br />' <br />Department of Natural Resources /~Q <br />" <br />~ <br />$~ <br />I <br /> I * <br />* <br />1313 Sherman Street, Room 818 * <br />Denver, Colorado 80203 * ~g76 <br />Phone 303-866-3581 Response to Reclamation Permit Application Consideration <br />FAX 303-866-3589 ..~---~-- <br /> Bill Ritter, Jr. <br />http://www.water.state.co.us Governor <br /> Harris D. Sherman <br /> Executive Director <br />DATE: December 14, 2007 <br /> Dick Wolfe, P.E. <br />TO: Travis H. Marshall, Environmental Protection Specialist State Engineer <br />CC: Division 5 Office; District 39 Water Commissionfe~r <br />FROM: Cynthia J. Love, Water Resources Engineersy;SC <br />RE: Operator: Marathon Oil Company, Circle Dot Quarry, File No. M-2007-067 <br />Section 1, Twp 6 S, Rng 97 W, 6th P.M., Garfield County <br />Landowner- Berry Petroleum Company <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water (will contract for water truck services) for:_dust <br />control uses at the permit site, storage in the excavated area(s). <br />^ Other: <br />COMMENTS: <br />RE~~S~~~ <br />vGEC 17 2001 <br />'j~~ Division of Recla~t~atlpn, <br />vl Mining and Safety <br />