My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-14_PERMIT FILE - M2007087
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007087
>
2007-12-14_PERMIT FILE - M2007087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:31 PM
Creation date
12/17/2007 2:10:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007087
IBM Index Class Name
PERMIT FILE
Doc Date
12/14/2007
Doc Name
New Application
From
Albert Frei and Sons, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT D (CONT~ <br />will prevent any damage to said wall. By leaving 90 feet instead <br />of 15 feet the safety factor is increased by nearly 600%. The <br />discussion contained in the Geotechnical Stability Exhibit <br />explains why mining will have no impact on the slurry wall. <br />The setback lines on the map are the indication of the <br />mining limits, i.e., the top of the slope into the mining area. <br />When the setbacks will no longer be disturbed they will be <br />reclaimed as prescribed in the reclamation plan. <br />During mining all interior pit slopes will be maintained <br />with a pit-ward attitude so that there will be no drainage off <br />the affected land. This same slope management plan will prevent <br />any offsite slides or other disruptions, and will also address <br />some of the storm-water runoff questions arising from the Clean <br />Water Act. No water will be discharged from the pit and all <br />stormwater will be collected on the site as required. <br />We have adequate water available to meet the requirements <br />for evaporative loss during initial mine startup, see EXHIBIT G. <br />An application will be made for a well permit to address the need <br />for evaporative losses associated with mining in the ground water <br />table. This will only be needed until reclamation is complete as <br />the entire area will be backfilled so no lake area will be left. <br />MINING TIMETABLE <br />The continuing uncertainty of economic conditions in the <br />construction materials industry precludes an accurate forecast of <br />demand during the life of the mine. This estimated mining <br />timetable is based on an average year and it is expected that a <br />specific year will vary widely from the average. <br />MINING TIMETABLE <br /> ACRES AVERAGE ANNUAL <br />MINING AREA YEARS <br />TOTAL AREA <br />MINED AREA PRODUCTION <br />TONS~YEAR <br />Priola Pit 1-3 13.68 10.96 250,000 <br />Totals 13.68 10.96 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.