Laserfiche WebLink
T"'"' STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />December 3, 2007 v <br />Brandon Danforth <br />Cordilleran Compliance Services Inc. <br />826 21 %2 Road <br />~~~~~.~ <br />p~C 10 2001 <br />pjvisjon °j ~ d \a e~Y n, <br />~1(~I(1~ ~'(1 <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />- ~- <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Gra Junction, CO 81505 <br />t~ <br />e: Circle Dot Quarry, 110c Application No. M-2007-067, Preliminary Adequacy Review. <br />Dear Mr. Danforth: <br />The Division of Reclamation, Mining and Safety has begun the review process for the above referenced 110c <br />application. The project appears to be a straight forward operation to extract construction materials. A review of <br />the proposed project has only a few minor clarifications and issues to address. <br />1) Please supply proof of publication as soon as possible per rule 1.6.2(1)(d). <br />2) In the Mine Plan please clarify in Exhibit A that only 9.11 acres will be the maximum disturbance. <br />3) Please state in the Mine Plan the estimated depth to which soil, suitable as plant growth medium, will be <br />salvaged for use in the reclamation process per rule 6.3.3(b). <br />4) Please state in the Mine Plan the thickness of overburden or quantity of waste rock, if any, to be removed to <br />reach the deposit per rule 6.3.3(c). <br />5) In the Mine Plan specify the thickness of the deposit to be mined per rule 6.3.3(d). <br />6) In the Mine Plan please specify the dimensions of any existing roads that require significant upgrades or <br />proposed roads that will be used for the mining operation per rule 6.3.3(g). <br />7) In the Reclamation Plan please explain how the seedbed will be prepared to eliminate compacted conditions <br />(e.g., plowed, chiseled, disced) per rule 6.3.4(c)(ii). <br />8) Please provide a product data sheet for "Regreen 404" as described in the in the seed mix. Also provide <br />application rate and cost per acre. <br />This is a preliminary review. Other issues may arise from other agency comments, a site inspection and as more <br />information is supplied. The decision date for this application has been set for December 28, 2007 provided all <br />issues have been addressed. If the requested information is not received by December 21, 2007 the applicant <br />should request an extension of the decision date. <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />