My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-10_REPORT - M2006078
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006078
>
2007-12-10_REPORT - M2006078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:16:42 AM
Creation date
12/11/2007 9:28:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
REPORT
Doc Date
12/10/2007
Doc Name
Annual Fee/Report/Map
From
Flatiron Constructors, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ <br />FLATIRON <br />CONSTRUCTORS <br />I N T E R M O U N T A I N <br />12/6/07 <br />Division of Reclamation, mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />RE: 111 Annual Fee Invoice and Annual Report <br />FLATIRON CONSTRUCTORS, INC. <br />10090 I-25 FRONTAGE ROAD LONGMONT, COLORADO 80504 <br />P.O. Box 2239 LONGMONT, COLORADO 80502.2239 <br />TeLEPHONE:303-A85~4050 / Fnx:303-7760072 <br />VJW W. FIATIRONCORP.GOM <br />Flatiron Constructors, Inc. hereby submits its 2007 Annual Report for the Camenish Borrow, Pit <br />Number M-2006-078. Check Number 1143 in the amount of $504.00 has been included for the <br />111 Annual Fee. <br />Following stripping of overburden material, export of material from the Camenish Borrow began <br />at the beginning of May, 2007 for the Colorado Department of Transportation, I-25 Widening <br />Project #IM-0253-160. Currently, thirty percent of the estimated mined material has been <br />exported from the site. Work at the pit is ongoing with current estimate for completion of mining <br />in December 2008. Reclamation site grading is scheduled to begin October 2008 with <br />revegetation seeding completed by May 2009. <br />No changes in the previous year's map are necessary. A copy of the November 2006 Mining Plan <br />has been included for reference. <br />Thank you, <br />Matthew (Matt) S. Phelps <br />Flatiron Constructors, Inc. <br />AN EQUAL OPPORTUNITY EMPLOYEE <br />
The URL can be used to link to this page
Your browser does not support the video tag.